Saturday, January 17, 2026
spot_img
spot_img
HomeNews & ViewsBusiness FocusOmera Renewable Energy Ltd and Ananta Huaxiang Ltd. signed a CAPEX Project for a...

Omera Renewable Energy Ltd and Ananta Huaxiang Ltd. signed a CAPEX Project for a 1.54 MWp Grid-Tied Rooftop Solar System

spot_img

On August 17, 2025, Omera Renewable Energy Limited and Ananta Huaxiang Ltd. (Ananta Group) signed a CAPEX Project for a 1.54 MWp Grid-Tied Rooftop Solar System.

Signing representatives:

Masudur Rahim, CEO, Omera Renewable Energy Limited

Niffari Nissar, CEO, Ananta Huaxiang Ltd., Ananta Group

With participation from:

Kazi Umme Jahan, Omera Renewable Energy Limited

Sudantha Thusitha Kumara, Ananta Huaxiang Ltd.

Thushara Jayakody, Ananta Huaxiang Ltd.

This marks our 3rd successful collaboration with Ananta Group, following projects at Ananta Casual Wear Ltd. (2024) and Ananta Denim Ltd. (2025). Together, we continue driving the vision of a sustainable future.

Go Green Today For A Brighter Tomorrow…Omera Renewable Energy Ltd 

YOU MAY ALSO LIKE
- Advertisement - spot_img
spot_img

Join Our Weekly Newsletter

Upcoming Events

 

Simillar News

Recent Random

Barmag’s new texturing machine impresses the market

eFK EvoSmart sets new standards in efficiency and productivity Since its premiere at ITMA Asia + CITME 2025, the eFK EvoSmart texturing machine has achieved...

BGBA elects new leadership for 2026–2028 term

On behalf of the Election Board of the Bangladesh Garment Buying House Association (BGBA), we are pleased to share that the BGBA Executive Committee...

Round Table Talk on The Adoption of Renewable Energy in the Textile and Apparel Industry

Energy discussions took center stage in the heart of the textile industry on a late September day in Dhaka, not at a government briefing...